2.1Requirements for Installation Environment

XG0224 Hardware Guide

Chapter 2 Installation

 

 

2.1Requirements for Installation Environment

Before installing the switch, please check the following:

Make sure that the switch and all the other options shown in this document are available for installation.

All the cables comply with the specifications of the interface connectors.

2.1.1Installation RequirementsWarning

Do not connect cables to interface connectors other than those adaptable to the connector’s specifications.

Temperature and Humidity Requirements Reference "1.1.1 Parts List" (pg.18)

Install the product under the following environmental conditions

2.1.1Installation Requirements

Power RequirementsCaution

Install the product under the following conditions. Using the product outside the required environment may cause failure of the product.

Temperature and Humidity Requirements

 

Temperature (degrees C)

Humidity (%RH)

Operation

0 to 40

15 to 85

 

 

 

Non-operation

0 to 50

8 to 90

 

 

 

Power Requirements

Item

Requirements

Voltage

AC90V-264V

 

 

Frequency

50Hz / 60Hz +2%, -4%

Ground

Separate ground wire from air conditioners and building, and D-class grounding with

ground resistance of 100 or less.

 

 

 

Electricity

80W

 

Maximum30A

Inrush Current

Ensure installation environment that avoids lowering voltage to power supply

equipment at the time of power-on due to the inrush current, although there’s no

 

 

impact from the inrush current in normal use.

 

 