1. MOUNTING

9. Attach three EMI cores to the signal cable as shown below.

 

J821 VH9P

 

J822

VH2P

Lead in

J824

NH13P

 

 

cable here.

J823 VH4P

EMI core

RFC-13

Clamp

Route cable along here.

Figure 1-15 Antenna unit chassis, cover opened

10.Fix the signal cable with the cable clamp.

11.Release the stay and close the cover. Loosely fasten the cover fixing screws; you will have to make some adjustments inside after completion of wiring.

Note: When closing the cover, set the gaskets to grooves in the bottom chassis, then tighten bolts.

BOTTOM

CHASSIS

GROOVE

GASKET

SCANNER BOLT

Torque :9.8 ± 0.1 N • m

Figure 1-16

1-9

Page 15
Image 15
Furuno 851 MARK-2 installation manual Antenna unit chassis, cover opened