640t – Installation and Operating Instructions
Loading Film Onto the Supply Shafts
If you are loading film for the first time, skip these instructions and start with the instructions, “To load films onto the supply shafts:” on page
3.If the unwind/supply shaft (“Fig.
Fig. 6-6. Roller Pressure Handle.
To remove existing films:
Refer to Figs.
1.Put the roller pressure handle to 1/2”. A in “Fig.
2.Cut the remaining top and bottom films just ahead of the pressure rollers. Do not allow the remaining film to pass through the laminator if there is any exposed adhesive. Pull the remaining film out the front of the machine.
CAUTION: Be careful to not cut the pressure rollers. Failure to observe this notice can result in damage to the rollers.
Fig. 6-8. Supply Shaft Cradle End.
4.Do the previous steps for the top and bottom supply shafts.
5.Slide the core off the shaft and core adaptors. Tip: Twist the shaft while pulling to remove the core easier.
6.Clean the pressure rollers if needed. See “7. Operator Maintenance” on page
Fig. 6-7. Supply Shafts.
Page