640t – Installation and Operating Instructions

Loading Film Onto the Supply Shafts

If you are loading film for the first time, skip these instructions and start with the instructions, “To load films onto the supply shafts:” on page 6-5. If you are replacing existing films, perform the following set of instructions, “To remove existing films:” on page 6-4.

3.If the unwind/supply shaft (“Fig. 6-7. Unwind/ Supply Shafts.”) is on the machine, grasp the bearing end and lift it out of the cradle (“Fig. 6-8. Supply Shaft Cradle End.”). Then pull the left end out of the brake hub.

Fig. 6-6. Roller Pressure Handle.

To remove existing films:

Refer to Figs. 6-6 through 6-8.

1.Put the roller pressure handle to 1/2”. A in “Fig. 6-6. Roller Pressure Handle.”

2.Cut the remaining top and bottom films just ahead of the pressure rollers. Do not allow the remaining film to pass through the laminator if there is any exposed adhesive. Pull the remaining film out the front of the machine.

CAUTION: Be careful to not cut the pressure rollers. Failure to observe this notice can result in damage to the rollers.

Fig. 6-8. Supply Shaft Cradle End.

4.Do the previous steps for the top and bottom supply shafts.

5.Slide the core off the shaft and core adaptors. Tip: Twist the shaft while pulling to remove the core easier.

6.Clean the pressure rollers if needed. See “7. Operator Maintenance” on page 7-1.

Fig. 6-7. Supply Shafts.

Page 6-4

Page 24
Image 24
GBC 640T operation manual Loading Film Onto the Supply Shafts, To remove existing films