GE ZBD5600 Step, toekick brackets, Installation, Install Custom Door Panel, Remove wood base

Models: ZBD5900 ZBD5600 ZBD5700

1 24
Download 24 pages 29.55 Kb
Page 10
Image 10
Install Custom Door Panel

Install Custom Door Panel

Step 1

Remove wood base

Step 2

Install leveling legs

&toekick

brackets

Installation

Stainless Steel Interior Dishwasher

If you intend to install custom door panels, refer to installation instructions provided in this booklet. The panels should be in place before installing the dishwasher.

Cut the shipping carton and use it as a pad under the dishwasher. This will protect the finished floor in the kitchen.

Lay the dishwasher on its back.

Remove the 4 screws holding the dish- washer to the wood base. Discard screws.

Retain wood base.

Insure that the floor of the cutout is the same level or higher than the rest of the room. If the kitchen floor is tile, it may be elevated above the floor of the installation cutout. Pieces of the wood base may be

placed into the cutout floor to make it level

 

22-7/16"

 

or higher than with the kitchen floor. This

 

 

 

 

 

will allow for easy removal for any future

 

 

 

service.

 

 

 

Un-wrap the drain hose and pull to the rear of the dishwasher. Take care not to kink or crush the hose.

• Install toekick support brackets on the left and right sides of the mounting brackets using 2 screws each. See illustration for correct orientation.

Install the front leveling legs provided in the parts package. The legs should be at least 2” from the bottom edge of the mounting bracket.

Adjust leveling legs to installation height. Tighten leveling leg locking nuts on the

rear.

2" Min.

Screw C

Mounting Bracket

 

Toekick Support Bracket

10

Page 10
Image 10
GE ZBD5600 Step, toekick brackets, Installation, Install Custom Door Panel, Remove wood base, Install leveling legs