GE ZBD5600, ZBD5700, ZBD5900 Prepare the Opening, Water Supply, Installation Preparation

Models: ZBD5900 ZBD5600 ZBD5700

1 24
Download 24 pages 29.55 Kb
Page 7
Image 7
Prepare the Opening

Installation Preparation

Stainless Steel Interior Dishwasher

Prepare the Opening

The rough cabinet opening must be 24” min. deep, 23-5/8” min. to 24” max. wide. The opening height should be 34” min. and 35” max.

The opening should be free of extraneous pipes and wires.

 

This Wall Area

 

 

must be Free of

 

34" to 35"

Pipes or Wires

24"

1-3/4"

Underside

Min.

of Countertop

 

 

to Floor

 

 

 

 

6"

 

23-5/8" Min.

 

 

24" Max

 

Water Supply

Hot water line may enter from either side, from the rear, or from the floor within the shaded area shown.

Turn off water supply.

Cut a hole approximately 1-1/2” in diam- eter to admit water line. Access hole must be round and smooth.

Install a hand shut-off valve in the supply line in an accessible location, such as under the sink. (The shut-off valve is optional, but recommended and may be required by local codes.)

Install the hot water line, using no less than 3/8” O.D. copper tubing or 1/2” O.D. plastic tubing.

The water line must be long enough to form a smooth natural loop with no sharp bends or kinks between the cutout entry and fill valve location, centered at the front of the dishwasher.

Adjust the water heater to deliver 120°F min. water temperature.

The water pressure of the hot water supply line must be 20 to 120 psi.

Before connecting, flush water line to clean out debris.

Shut-off Valve

1-1/2"

Right Side Entry

 

 

Dia.

Approx. 40"

1-3/4"

 

Hole

 

from Wall

Hot

 

 

 

6"

 

 

 

 

 

Left

 

 

 

 

Side Entry

 

 

Cabinet Face

Approx. 30"

 

from Wall

2" from Floor

7

Page 7
Image 7
GE ZBD5600, ZBD5700 Prepare the Opening, Water Supply, Installation Preparation, Stainless Steel Interior Dishwasher