GE ZBD5700, ZBD5600, ZBD5900 Step Install Toekick Assembly, Step Install Side Trim, Installation

Models: ZBD5900 ZBD5600 ZBD5700

1 24
Download 24 pages 29.55 Kb
Page 15
Image 15
Step 11

Installation

Stainless Steel Interior Dishwasher

Step 11

Install

Toekick

Assembly

Install toekick slides to toekick support brackets. Use slide stamped “L” on left and “R” on right side.

Align front and inner toekicks, matching screw holes.

Align toekick to second screw hole in toekick slide as illustrated.

Install color matched screws “E” through the front of the toekick and into the toekick slides. Do not tighten screws.

Carefully, slide assembly back until it is aligned with adjacent cabinetry toekick.

Adjust the height of the panel by loosening screws and sliding the front panel down, even with the floor.

Carefully, hold the door and open fully. Ensure that door does not strike top of toekick.

Adjust toekick height if necessary.

Tighten screws.

Front Toekick Panel

Inner Toekick

Left Side

Toekick

Slide

Slide toekick out

Screw E

Attachment Screws

Pull tab while Pushing toekick in

Step 12

Install

Side Trim

Side trim filler strips are packed with this dishwasher. If the cabinet cutout is wider

than the dishwasher, install the filler strips on both sides of the dishwasher to cover gaps.

Open the door fully.

Place side trim against dishwasher tub and install 2 screws, loosely on each side.

Adjust trim to correct width. Tighten screws.

Side

Trim

Screw B

15

Page 15
Image 15
GE ZBD5700 Step Install Toekick Assembly, Step Install Side Trim, Installation, Stainless Steel Interior Dishwasher