GE ZBD5600 Step Install Drain Line, Step Connect Electrical, Drain Line Preparation, Installation

Models: ZBD5900 ZBD5600 ZBD5700

1 24
Download 24 pages 29.55 Kb
Page 13
Image 13
Step 8

Installation

Stainless Steel Interior Dishwasher

Step 8

Install

Drain Line

Follow all local codes and ordinances.

Drain Line Preparation

The dishwasher is supplied with a 78” long corrugated drain hose.

If the location requires a longer drain hose, add up to 42” length to the supplied hose. Use 3/4” inside diameter hose and thin wall copper coupler to join the hose ends.

Note: Total drain hose length must not exceed 10 feet for proper drain operation.

Method 1 – Air Gap with Waste Tee or Disposer

Waste Tee Installation

Disposer Installation

Method 2 – High Drain Loop

with Waste Tee or Disposer

Drain Line Installation

Connect drain line to air gap, waste tee or disposer using either method 1 or 2 as previously determined.

Secure connection using appropriate clamps (not supplied).

Make sure drain hose is not kinked.

Note: Remove drain plug before connecting to disposer. Dishwasher cannot drain if plug is left in place.

Fasten to underside

Fasten to underside

of countertop

 

 

of countertop

 

30"

30"

12"

Min.

 

12" Min.

Min.

 

 

Min.

 

 

Waste Tee Installation

Disposer Installation

Step 9

Connect

Electrical

(For direct connection to house wiring)

Drain Line Preparation WARNING If house wiring is not 2-wire with a ground wire, a ground must be provided

by the installer. When house wiring is aluminum, be sure to use U.L. listed anti-oxidant compound and aluminum- to-copper connectors.

Drain Line Installation AVERTISSEMENT

Si le circuit de la maison n’a pas deux

 

fils, plus un fil de terre, l’installateur

 

doit installer un fil de terre. Quand les

 

fils de la maison sont en aluminium, il

Screw F

faut prendre soin d’utiliser une pâte

 

anti-oxydante et des connecteurs

 

aluminium à cuivre sur la liste UL.

 

Verify that power is turned off at the source.

Install a strain relief onto the junction box and tighten against the incoming wires.

Strip 1/2” insulation from end of incoming wires.

Use wire nuts of appropriate size and con- nect white to white, black to black and incoming ground to green wire.

Push all wires into the junction box and place on dishwasher frame. Secure with screws “F”.

13

Page 13
Image 13
GE ZBD5600, ZBD5700 Step Install Drain Line, Step Connect Electrical, Drain Line Preparation, Drain Line Installation