Manuals
/
GE
/
Kitchen Appliance
/
Ventilation Hood
GE
ZV850 installation instructions GE Monogram Installation Instructions 36 Island Vent Hood
Models:
ZV850
1
1
16
16
Download
16 pages
16.84 Kb
1
2
3
4
5
6
7
8
<
>
Install
Dimension
Secure Wiring
Power Supply
Page 1
Image 1
GE Monogram
®
Installation
Instructions
36" Island Vent Hood
Model
ZV850
Page 2
Page 1
Image 1
Page 2
Contents
Model ZV850
GE Monogram Installation Instructions 36 Island Vent Hood
For Monogram local service in your area
Contents
For Monogram service in Canada, call
For Monogram Parts and Accessories, call
Required Accessory
Product Dimensions
Design Information
Model Available
Power Supply
Installation Preparation
Tools and Materials Required
Electrical supply
Flexible ducting
Duct fittings
Installation Preparation
This Hood Must
Plan the location
Advance Planning
Ceiling support structure
Installation Preparation
Ductwork
Advance Planning continued
Finish the Ceiling
Installation Preparation
Installation
Check Installation Hardware
Remove the Packaging
Install upper support frame
Install Support Frame
Install lower support frame
Mount Template
Size And Install Ductwork
Secure Wiring
Wiring
To Find Required Duct Length
Installation
Install Decorative Duct Covers
Note TWO PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION
Install Hood
Verify that power is turned off at the source
Connect Electrical
Installation
Slide Duct Cover Down Install Side Utility Bars
Install the side utility bars with screws as shown
Slide the lower duct cover down onto the hood
Finalize Installation
Install Filters
Installation
36 Island Vent Hood
Monogram