Manuals
/
GE
/
Kitchen Appliance
/
Ventilation Hood
GE
ZV850 installation instructions Island Vent Hood
Models:
ZV850
1
15
16
16
Download
16 pages
16.84 Kb
9
10
11
12
13
14
15
16
<
>
Install
Dimension
Secure Wiring
Power Supply
Page 15
Image 15
Notes
36" Island Vent Hood
15
Page 14
Page 16
Page 15
Image 15
Page 14
Page 16
Contents
Model ZV850
GE Monogram Installation Instructions 36 Island Vent Hood
For Monogram Parts and Accessories, call
Contents
For Monogram local service in your area
For Monogram service in Canada, call
Model Available
Product Dimensions
Required Accessory
Design Information
Electrical supply
Installation Preparation
Power Supply
Tools and Materials Required
This Hood Must
Duct fittings
Flexible ducting
Installation Preparation
Installation Preparation
Advance Planning
Plan the location
Ceiling support structure
Installation Preparation
Advance Planning continued
Ductwork
Finish the Ceiling
Check Installation Hardware
Installation
Remove the Packaging
Mount Template
Install Support Frame
Install upper support frame
Install lower support frame
To Find Required Duct Length
Secure Wiring
Size And Install Ductwork
Wiring
Installation
Install Decorative Duct Covers
Connect Electrical
Install Hood
Note TWO PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION
Verify that power is turned off at the source
Slide the lower duct cover down onto the hood
Slide Duct Cover Down Install Side Utility Bars
Installation
Install the side utility bars with screws as shown
Install Filters
Finalize Installation
Installation
36 Island Vent Hood
Monogram