Advance Planning

Installation Preparation

36" Island Vent Hood

Step1

Advance Planning

Plan the location

Determine the exact location of the vent hood.

Use a plumb to check location to be sure countertop/cooktop location below the hood will align exactly.

The hood should project forward 1-1/2” beyond the front edge of the cooking appli- ance. See illustration.

Observe the recommended 25-1/2" space between the cooking surface and bottom of hood.

Ceiling

Hood

Ducting

Centerline

Hood

Front Plan the location13-3/4"Ceiling support structure

Manual background 27-1/2"

Approx. 1-1/2"Manual background

Beyond CookingCooktop

Surface

Countertop

Side View

8-3/4"

 

Top View of Support Framing

Cross

 

 

Framing

 

 

 

 

 

16"

*7-5/8"Joist

Typical Support Frame Mounting

*The framing should be spaced 8-3/4” on the sides and 7-5/8" at the front from centerline to centerline to accept mounting screws in the vent support frame.

Ceiling support structure

At the hood location, install 2 x 4 cross framing between ceiling joists as shown.

The 2 x 4 cross framing can be installed standing or flat, depending on duct run. See illustration of ductwork, page 7.

Cross

Framing

Ceiling

Manual background8-3/4"Manual background

Side

View

Front of

Hood

Upper

Support

Frames

Lower

Note: The cross framing must be spaced 8-3/4” on the side from centerline to centerline in order to accept the hood mounting screws.