GE Monogram Built-In All-Refrigerator/Freezer Start Icemaker, Install Toekick, Copper Tubing

Models: Built-In All-Refrigerator/Freezer

1 24
Download 24 pages 43.05 Kb
Page 20
Image 20
STEP 10 CONNECT WATER SUPPLY (FREEZER MODELS ONLY)

Installation Instructions

STEP 10 CONNECT WATER SUPPLY (FREEZER MODELS ONLY)

House

Freezer

Water Supply

Water Supply

Locate and bring the tubing to the front of the cabinet.

Turn the water on to flush debris from the line. Run about a quart of water through the tubing into a bucket, then shut off the water.

Copper Tubing:

Slip a 1/4" nut and ferrule (provided) over both ends of the copper tubing. Insert the tube into the union fitting on the unit and tighten the nut to the union.

Turn on the water to check for leaks.

GE SmartConnectTubing:

Insert the molded end of the tubing into

the refrigerator or freezer connection. Tighten the compression nut until it is just hand-tight.

Tighten one additional turn with a wrench. Overtightening can cause leaks!

Turn on the water to check for leaks.

NOTE: Make sure excess tubing length does not interfere with the toekick installation.

STEP 11 START ICEMAKER

Icemaker

Power

Feeler Arm

Switch

 

Slide the switch to ON. The icemaker will begin opera- tion automatically.

Be sure nothing interferes with the sweep of the feeler arm.

Discard the first full bucket of ice cubes.

To turn the icemaker off, slide the switch to OFF.

STEP 12 INSTALL TOEKICK

Locate the supplied toekick (shipped taped to the side of the product). Install with 2 screws provided, adjust to the desired height and tighten the screws.

A custom toekick can be installed to match or complement the surrounding cabinetry. Use the supplied toekick as a template to cut out the notch.

Supplied Toekick

1/4" or Thicker Toekick

IMPORTANT: The vented toekick must remain unobstructed for proper air circulation and operation.

20

Page 20
Image 20
GE Monogram Built-In All-Refrigerator/Freezer Start Icemaker, Install Toekick, Copper Tubing, GE SmartConnect Tubing