GE Monogram ZGU365 installation instructions JXRB57 Kit, Prepare the Vent

Models: ZGU365

1 24
Download 24 pages 50.32 Kb
Page 14
Image 14
JXRB57 Kit

JXRB57 Kit

For Indoor Remote Blower Locations

Tools and Materials required:

Pencil

Measuring tape

Drill with appropriate bits

Nut driver

Junction box

Wire nuts

Safety glasses

3-1/4" x 10" to 6" round transition.

3-1/4 x 10" duct, (or 6" round) sufficient length to reach the outdoor wall cap or roof cap.

Electrical cable and connectors, sufficient length to connect the downdraft vent to the remote blower location. 14-guage min. is recommended, must conform to local codes.

This kit provides for the installation of the blower and motor outside of the cabinet, such as below the floor. Use this kit for indoor remote installations only.

Note: A 3-1/4" x 10 transtion to 6" round is required.

Parts Supplied

Package of screws

Cover Plate

Hanger Brackets

Outlet Plate

Step1

Prepare the Vent

3"

Blower Wire Box

Loosen

Screw

Prepare the VentBlower Conduit

Flatten the shipping box to use as a pad.

Place the unit on its back onto the protec- tive pad.

Remove the wire box on the plenum.

Cut the blower leads approximately 3" from the plug on the end of the vent.

Remove the blower conduit by loosening the screw on the fitting.

Set aside the 3" wire leads with plug, wire box and screws.

14

Page 14
Image 14
GE Monogram ZGU365 installation instructions JXRB57 Kit, Prepare the Vent