JXBC57 Kit

For Outdoor Remote Blower Locations

Step3

(continued)

Remove the 4 nuts holding the blower to the mounting plate. One nut is hidden inside the outlet. Remove blower.

Remove the blower mounting plate.

Remove 2 screws along the bottom of the blower box which are visible once blower plate is removed.

Carefully, turn the unit over to access the back side.

Remove 4 screws along the top of the blower box.

Turn the unit over and remove the 4 screws along the top.

Remove the blower box.

Retain all screws.

Important: Save any unused parts. If the appliance is relocated at a later time, parts may be needed.

Hidden

Screws

Blower

Blower

Blower Box

 

Mounting

 

Plate

 

• The downdraft plenum can discharge from either the right or left side. Select the side

Downdraft

that provides the best alignment to ductwork extending to the blower assembly.

For a left side discharge, install the outlet plate to the bottom of the plenum on the left side. Install the cover plate to the bottom of the right side. Reverse plates for a right side discharge.

.

• A transition is required to connect the 3-1/4" x 10" duct to the 6" round inlet on

the blower.

Duct Adapter

 

• Tape to seal all joints.

Outlet Cover

 

Step4

Connect

Blower

Wires

Check that the red plastic anti-short bushing is secured in the end of the conduit. Install the blower conduit into the conduit connector on the junction box and tighten the screw.

Install a liquid tight fitting in the hole of the wire compartment on the base, sized to fit wire being used.

Run the electrical wiring from the downdraft vent to the wire compartment.

Attach the green ground leads from the wire compartment, connecting one to the green ground lead on the blower and the other to the ground lead of the wiring from the downdraft vent.

Connect the neutral (white) and power lead (black) from the blower to the leads from the downdraft vent.

Use wire nuts to connect wires.

 

Blower

 

Conduit

 

Red Anti-

Base

Short Bushing

Assembly

Conduit

Wires

Connector

Wire

to Vent

Compartment

 

Strain

Green Ground

Relief

Leads

19

Page 19
Image 19
GE Monogram ZGU365 installation instructions Connect Blower Wires