GE Monogram ZGU365 installation instructions Connect Ductwork, Connect Electrical, JXRB57 Kit

Models: ZGU365

1 24
Download 24 pages 50.32 Kb
Page 16
Image 16
Connect Ductwork

JXRB57 Kit

For Indoor Remote Blower Locations

Step3

Connect Ductwork

Downdraft

Duct Adapter

Outlet Cover

The downdraft plenum can discharge from either the right or left side. Select the side that provides the best alignment to ductwork extending to the blower assembly below.

For a left side discharge, install the outlet plate to the bottom of the plenum on the left side. Install the cover plate to the bottom of the right side. Reverse plates for a right side discharge.

.

Connect the plenum to the ductwork. A transition is required to connect the

3-1/4" x 10" duct to the 6" round inlet on the blower.

Tape to seal all joints.

Step4

Connect Electrical

Use electrical cable and connectors that conform to local codes (14 gauge min. is recommended). Use a length to reach between the vent and the blower/motor location.

Attach the wire box removed from the blower conduit to the end of new wiring.

Use wire nuts to secure the wire to the 3" remaining wires with plug.

Insert the plug into the mating plug on the vent.

Reinstall wire box with original screws.

Install a junction box withing reach of the blower conduit.

Use a conduit fitting to secure conduit to junction box. The red plastic anti-short bushing should be secured to the end of the conduit.

Use wire nuts to connect wires.

Plenum

Provided

Mounting

Screws

Blower

Wire

Box

3-Wire

Connectors

Wire Nuts

Connect Electrical Wiring to Blower Junction Box

16

Page 16
Image 16
GE Monogram ZGU365 installation instructions Connect Ductwork, Connect Electrical, JXRB57 Kit