Generac Portable Products Power Transfer System
INSTALLATION
PROCEDURE
Load Manager™ Switch
Before removing the load center cover, plan mounting location for both Load Manager™ switches. To do so, hold a Load Manager™ switch about 18 inches from the center of the load center, as shown in Figure 2.
Figure 2 — Planning Switch Location
NOTE: The following procedure describes the installation of one Load Manager™ switch. Use identical instructions to install and test the second Load Manager™ switch.
1.Ensure there is enough room to mount both Load Manager™ switches so their flex conduit attaches directly to the load center.
2.Identify appropriate vacant load center 3/4” knockouts.
DANGER: Contact with wires and terminals inside the load center must be avoided as contact may result in dangerous electrical shock. Before removing the load center cover, switch OFF the main circuit breaker serving the load center. Remember that wires on the line side of the main circuit breaker are electrically dangerous.
3.Turn OFF the load center’s main circuit breaker, then remove the load center cover.
4.Remove the predetermined knockouts. Route all wires extending from the flexible conduit attached to a Load Manager™ switch through the empty
hole, as shown in Figure 3. Secure the conduit connector to the load center with the supplied lock nut.
Figure 3 — Wire Loom from Switch
5.Anchor the Load Manager™ switch to the wall at the selected position, as shown in Figure 4.
Figure 4 — Anchoring Load Manager™ Switch
4