MOUNTING THE OPERATOR:

1.Getting Started.

Position rail/power head assembly (Fig. 2-7).

Rail strap leaning on wall next to header bracket.

Place material on floor under power head to protect from scratching. (A box, stool, or similar device may be needed to clear a torsion spring, as shown.)

2.Mounting the assembly.

Attach rail strap to header bracket using nut (47) (Fig. 2-7 inset). FINGER TIGHT ONLY.

[47]

5/16"-18

FIG. 2-7 Position assembly.

HEADER BRACKET

13

Support power head on step-ladder.

NOTE: Before final attachment to ceiling, insure that assembly is in proper alignment (Fig. 2-9).

Attach mounting straps to ceiling using lag

bolts (22) (Fig. 2-10).

Set height of power head according to following:

Track guided doors.

a. Rail must clear door at highest point of travel

b. Be level or, power head slightly below level.

Trackless doors.

90°

NO

YES

DOOR

VIEW FROM ABOVE

(not to scale)

NO

a. Rail must clear door at highest point of travel

by 1" to 1-1/2".

Securely tighten power head mounting bolts (46)

and nuts (47).

Lower door.

Fully tighten rail strap nut.

DO NOT PLUG UNIT IN YET!

3. Adjusting length of emergency release cord.

Check emergency release knob height.

Low enough you can reach it.

High enough to clear your vehicle, but

NO HIGHER THAN 6 FEET ABOVE FLOOR.

Tie a new overhand knot where desired.

Cut off any extra cord.

[22]

1/4" x 2"

[46][47]

5/16"-18 x 3/4"

5/16"-18

FIG. 2-9 Operator must be aligned.

ANGLE IRON ON FINISHED CEILING

 

DRYWALL

Attach angle iron to beams

UNFINISHED OR OPEN BEAM

Extra framing

[22]

not needed

 

Mounting Straps

[22]

 

[46 & 47]

[46 & 47]

 

 

Extra framing

 

NEEDED

FIG. 2-10 Mounting the power head.

Page 13
Image 13
Genie 3452535556 PCG, 3452535556 GCG manual Mounting the Operator