20.Attach a Barbell Guide (112) to the Top Frame (17) with an M10 x 55mm Bolt (127), two M10 Washers (148), two M10 x 6.5mm Spacers (151), and an M10 Nylon Locknut (153).

Attach the other Barbell Guide (not shown) to the Top Frame (17) in the same way.

See steps 14, 16, and 17. Tighten the M10 x 110mm Screws (130).

21.Attach a Weight Carriage Guide (21) to the Weight Carriage Base (20) with an M10 x 55mm Bolt (127), two M10 Washers (148), two M10 x 6.5mm Spacers (151), and an M10 Nylon Locknut (153). Do not tighten the Nylon Locknut yet.

Attach the other Weight Carriage Guide (21) to the Weight Carriage Base (20) in the same way.

22.Slide the two Weight Carriage Bumpers (138) onto the Weight Carriage Guides (21).

Orient the Weight Carriage (19) as shown, and slide it onto the Weight Carriage Guides (21). Tighten the two Weight Carriage Tubes (96) onto the Weight Carriage. Next, slide the Weight Bumpers (97) onto the Weight Carriage Tubes.

20

 

153

148

 

151

 

151

17

 

127

 

148

 

112

21

 

 

21

 

21

 

153 151

 

148

 

148

 

127

 

151

 

20

22

 

97

 

 

21

96

Hole

 

19

 

138

97

96

 

15

Page 15
Image 15
Gold's Gym GGBE8057.0 manual