Grizzly g0669X Assembly, Tools Needed, To assemble the mill, Snap Ring Pliers, Hex Wrench 4mm

Models: g0669X

1 76
Download 76 pages 40.61 Kb
Page 20
Image 20
Assembly

Assembly

 

Tools Needed

Qty

Snap Ring Pliers

1

Hex Wrench 4mm

1

Wrench 14mm

1

Phillips Screwdriver

1

Standard Screwdriver

1

To assemble the mill:

1.Move the head to an upright position (refer to Head Movement on Page 27 for detailed instructions).

2.Thread a handle onto the vertical crank and use the 14mm wrench to fully tighten it.

3.Use the snap ring pliers to remove the retain- ing ring from the vertical crank leadscrew (see Figure 12), slide the crank on the leadscrew, then replace the retaining ring.

 

Retaining Ring

Crank

Handle

 

Figure 12. Vertical crank installed.

4.Use the vertical crank to raise the knee until you can position the splash pan on the base, then secure the pan in place with the two cap screws, as shown in Figure 13.

Cap Screw

(1 of 2)

Figure 13. Splash pan installed (left side

shown).

5.Thread the remaining handles onto the three ball handles and use the 14mm wrench to fully tighten them (see Figure 14).

Handle

Figure 14. Handle installed on ball handle.

-18-

G0669X Precision 10" x 54" VS Milling Machine

Page 20
Image 20
Grizzly g0669X Assembly, Tools Needed, To assemble the mill, Snap Ring Pliers, Hex Wrench 4mm, Phillips Screwdriver