SECTION 3: SETUP

Unpacking

Your machine was carefully packaged for safe transportation. Remove the packaging materials from around your machine and inspect it. If you discover any damage, please call us immediately at (570) 546-9663 for advice.

Save the containers and all packing materials for possible inspection by the carrier or its agent. Otherwise, filing a freight claim can be difficult.

When you are completely satisfied with the condi- tion of your shipment, inventory the contents.

SUFFOCATION HAZARD!

Keep children and pets away from plastic bags or packing materials shipped with this machine. Discard immediately.

Model G0763 (Mfg. Since 8/13)

Needed for Setup

The following are needed to complete the setup process, but are not included with your machine.

Description

 

Qty

Additional People

1

Safety Glasses

1 Pair Per Person

Cleaner/Degreaser (Page 15)..... As Needed

Disposable Shop Rags

As Needed

Forklift (rated for at least 2500 lbs.).

........... 1

Safety Hooks & Chains

 

(rated for at least 2500 lbs. each)

4

Precision Level

1

NLGI#2 Grease*

As Needed

Coolant

Approximately 8 Gal.

ISO 32 Oil*

Approximately 1 Pint

* See Page 34 for offerings from Grizzly.

-13-

Page 15
Image 15
Grizzly G0763 owner manual Unpacking, Needed for Setup, Description Qty