GTO 2502, 2550 installation manual Powering the System, Installation of the Transformer, Step

Models: 2502 2550

1 44
Download 44 pages 56.55 Kb
Page 25
Image 25
Powering the System

Powering the System

Installation of the Transformer

IMPORTANT:

The transformer is designed and intended for indoor use. If the transformer can be plugged only into an outside electrical outlet, a weatherproof cover or housing (available at local electrical supply stores) must be used.

All low voltage wire used with the GTO/PRO Gate Opener must be 16 gauge dual conductor, multi-stranded, direct burial wire (see page 22 and the Accessory Catalog). Do not run more than 1000 feet of wire.

If your gate is more than 1000 ft. from an ac power source, you will need to use at least one 5 watt Solar Panel to charge the battery (see Accessory Catalog). Refer to the Solar Panels and Gate Activity chart below.

OPTIONAL Solar Panels and Gate Activity

The table and map illustrate the maximum number of gate cycles to expect per day in a particular area when using from 10 to 30 watts of solar charging power. (see Accessory Catalog). The figures shown are for winter

(minimum sunlight) and do not account for the use of any accessory items. Accessories connected to your system will draw additional power from the battery.

NOTE: A maximum of 30 watts of solar charging power can be connected to the GTO/PRO Gate Opener. Consult Solar Panel Installation Instructions for further information.

Winter Ratings

Zone 1

Zone 2

Zone 3

 

 

 

 

12 v dual gate (10 watts) solar charger

4

8

13

12 v dual gate (15 watts) solar charger

7

13

20

12 v dual gate (20 watts) solar charger

10

18

27

12 v dual gate (25 watts) solar charger

13

23

34

12 v dual gate (30 watts) solar charger

16

28

41

 

 

 

 

 

Step 1

 

Make sure the power switch is OFF before proceeding to the next step.

 

Step 2

 

Select the electrical outlet into which you will plug the transformer.

 

Measure the distance from this outlet to the control box following the

 

path where the wire will be laid. After you have measured how much

ON/OFF Switch

wire is needed, cut the wire to the appropriate length.

 

21

Page 25
Image 25
GTO 2502, 2550 Powering the System, Installation of the Transformer, OPTIONAL Solar Panels and Gate Activity, Step