7.4Pendant

7.4.1The following procedure covers the installation of a pendant control station.

1)Attach the strain relief chain and the three hoses to the pendant station.

2)Attach the strain relief chain to the hoist valve body with the socket bolt as shown in Figure 7-4.

3)Attach the three hoists to the fittings on the hoist's valve body. Refer to Figure 7-4 and make sure the up, down and supply hoses are attached to the correct locations.

4)

 

NOTICE

When attaching tubes take care not to bend or kink tubing. This will result in

 

 

 

the air flow being restricted and poor response to the pendant controls.

5)Attach the hoist to supply air. Check for leaks and properoperation.

6) WARNING The pendant hoses hoist must be connected so that its direction of operation corresponds to the up-and-down lever on the pendant control; i.e. pushing the up button must cause the hook to raise. If the hoist does not operate correctly, shut off the air supply to the hoist and correct the pendant connections.

Figure 7-4Pendant Hose and Strain Relief Connections

36

Page 36
Image 36
Harrington Hoists TCR owner manual 4Pendant Hose and Strain Relief Connections