Heat & Glo LifeStyle 6000CMOD-IPI Installing Vent Pipe DVP and SLP Pipe, Assemble Pipe Sections

Models: 6000CMOD-IPI 8000CMOD-IPI

1 71
Download 71 pages 38.11 Kb
Page 37
Image 37
10 Installing Vent Pipe (DVP and SLP Pipe)

10 Installing Vent Pipe (DVP and SLP Pipe)

A. Assemble Vent Sections (DVP Pipe Only)

Attach Vent to the Firebox Assembly

Note: The end of the pipe sections with the lanced tabs will face toward the appliance.

Attach the first pipe section to the starting collar:

Lanced pipe end to the starting collar

Inner pipe over inner collar

Push the pipe section until all lanced tabs snap in place

Lightly tug on pipe to confirm it has locked.

Commercial, Multi-family (Multi-level exceeding two sto- ries), or High-Rise Applications

All outer pipe joints must be sealed with high temperature silicone (minimum of 300ºF continuous exposure rating), in- cluding the slip section that connects directly to the hori- zontal termination cap.

Figure 10.1 High Temperature Silicone Sealant

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.1

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when remov- ing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak.

Assemble Pipe Sections

A

B

Figure 10.2

Lances

Figure 10.3

Per Figure 10.2:

Start the inner pipe on the lanced end of section A into the flared end of section B.

Start the outer pipe of section A over the outer pipe of section B.

Once both vents sections are started, push firmly until all lanced tabs lock into place.

Lightly tug on the pipe to confirm the tabs have locked.

It is acceptable to use screws no longer than 1/2 in. (13

mm)to hold outer pipe sections together. If predrilling holes, DO NOT penetrate inner pipe.

For 90º and 45º elbows that are changing the vent direction from horizontal to vertical, one screw minimum should be put in the outer flue at the horizontal elbow joint to prevent the elbow from rotating. Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT penetrate inner pipe.

Note: Make sure that the seams are not aligned to prevent unintentional disconnection.

CORRECT

Figure 10.4 Seams

INCORRECT

Heat & Glo • 6000CMOD-IPI, 8000CMOD-IPI2241-900 Rev. H • 5/12

37

Page 37
Image 37
Heat & Glo LifeStyle 6000CMOD-IPI Installing Vent Pipe DVP and SLP Pipe, A. Assemble Vent Sections DVP Pipe Only, Lances