Heat & Glo LifeStyle BAY-40 Maintenance and Servicing the Fireplace, A. Disposal of Ashes

Models: BAY-40

1 52
Download 52 pages 14.25 Kb
Page 37
Image 37
11 Maintenance and Servicing the Fireplace

11 Maintenance and Servicing the Fireplace

A. Disposal of Ashes

Ashes should be placed in a metal container with a tight-fit- ting lid. The closed container of ashes should be placed on a noncombustible floor or on the ground, well away from all combustible materials, pending final disposal. If the ashes are disposed of by burial in soil or otherwise locally dis- persed, they should be retained in the closed container until all embers have thoroughly cooled.

A. Disposal of Ashes WARNING

Fire Risk

Disposal of ashes

Ashes should be placed in metal container with tight fitting lid.

Do not place metal container on combustible surface.

Ashes should be retained in closed container until all embers have thoroughly cooled.

B. Chimney Inspection/Cleaning WARNING

Fire Risk

Prevent creosote buildup

Inspect chimney once every two months during heating season.

Remove creosote to reduce risk of chimney fire.

Ignited creosote is extremely HOT.

B. Chimney Inspection/Cleaning

Inspect the chimney internally for obstructions and construc- tion damage. Flue pipe joints and seams must be continu- ous and mechanically tight.

The chimney should be inspected once every two months during the heating season.

If creosote has accumulated, it should be removed to reduce the risk of a chimney fire.

Refer to Figure 11.1 to remove/reinstall termination caps.

C. Firebox Refractory

Check firebox refractory for excessive cracks or gaps. If cracks exceed 1/4 in. (6 mm) in width the refractory should be replaced. See Section 12 for replacement information.

C. Firebox Refractory WARNING

Fire Risk

Inspect fireplace refractory annually.

Crumbling, deteriorated refractory can allow overheating of surrounding materials.

Note: As you use the fireplace, expansion and contraction will cause minor cracking of the refractory. This is normal, unavoidable, and will not affect the performance of the fireplace. If the cracks become large enough that the metal behind the refractory is exposed or large pieces fall out, the panels should be replaced.

Remove 8 screws (9 for King), lift top cover.

Cap Top Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

(Be sure holes in cap top and cap base are aligned.)

Cap Base Manual background

Remove screws,

Remove 4 screws

lift top cover.

and lift top pan off.

Top Cover

 

 

 

Cap

Cap

 

 

Chimney

Slip

Section

1.Remove the 4 screws.

2.Remove the screen.

3.Remove the baffle.

Cap Manual background

Chase Manual background

Remove 2 screws from the front and back and lift the top off.

European Copper Series

TR344/TR342

ST375

TS345/TS345P

TCT375

Termination Cap

Round

Square

Square

Terra Cotta

(CT-King shown)

Termination Cap

Termination Cap

Termination Caps

Termination Cap

Figure 11.1 Chimney & Termination Cap Cleaning

Heat & Glo • Multi-Sided Woodburning Fireplace • 34977 Rev T • 11/07

37

Page 37
Image 37
Heat & Glo LifeStyle BAY-40 Maintenance and Servicing the Fireplace, A. Disposal of Ashes, B. Chimney Inspection/Cleaning