Indoor unit installation

Flaring Work and Connection of Piping

Wrap the insulation material around the connecting portion.

1.Overlap the connection pipe heat insulation and the indoor unit pipe heat insulation material. Bind them together with vinyl tape so that there may be no gap.

2.Wrap the area which accommodates the rear piping housing section with vinyl tape.

Plastic bands

Insulation material

 

Connection

Indoor

unit piping

pipe

 

Vinyl tape

Wrap with vinyl tape

(wide)

 

 

Pipe

 

Vinyl tape(narrow)

Connecting cable

 

3.Bundle the piping and drain hose together by wrap- ping them with cloth tape over the range within which they fit into the rear piping housing section.

Reroute the pipings and the drain hose across the back of the chassis.

Drain hose 22Multi type Air Conditioner

Pipe

Manual background Vinyl tape(narrow)

Manual background Wrap with vinyl tape(wide)

Indoor unit installation

1.Remove the spacer.

2.Ensure that the hooks are properly seated on the installation plate by moving it left and right.

3.Press the lower left and right sides of the unit against the installation plate until the hooks engage into their slots(clicking sound).

Piping for

passage through

piping hole

Connecting cable

Drain hose

22Multi type Air Conditioner

Page 22
Image 22
Heat Controller DMH18DB-1 22Multi type Air Conditioner, Flaring Work and Connection of Piping, Indoor unit installation