Heatcraft Refrigeration Products H-ENGM0408, H-ENGM0806 manual Banana Ripening Room

Models: H-ENGM0408 H-ENGM0806

1 44
Download 44 pages 62.93 Kb
Page 19
Image 19
Banana Ripening Room

Banana Ripening Room

Banana hands or cluster shipped greens in fiberboard cartons, 10” x 16” x 22”, holding 42 lb. net (47 lbs. gross weight) with

864 boxes (3,288) lbs, net in a carload lot. Temperature held 56 to 58ºF.

Ripening facility consists of 5 or more air tight rooms to permit a completely weekly turn-over (1/2 carload room, measuring 30’ x 6’ x 22’H outside, holds 432 boxes packed, 24 boxes each on 18 pallets stacked 3 high by 6 long). Ripening process started with ethylene gas and ripening schedules maintained by control of room temperatures.

Heating is provided to bring the load up to temperature before ripening process is initiated. 12 to 20 Kw per carload. (Electric heater sheath temperature not over 600ºF. in dead still air).

Evaporators are selected at a T.D. of 15ºF., or less, with evaporator temperature controlled at no less than 40ºF. Approximately 12.5 cfm at 2/3” to 3/4” static per 41 lb. box of bananas.

Pull down load for 1ºF./hr. pull down rate based on maximum heat of respiration of 2.5 BTU/lb. and 0.8 sp. ht. for bananas and 0.4 for fiberboard boxing, plus minimal wall losses etc., 80 to 85 BTU/hr./ box of bananas. Holding load approximately 44 BTU/hr./box.

Extracted from ASHRAE 1974 APPLICATION HANDBOOK.

Loading: 5.3 lbs./Cu. Ft. of box, 11.28 lbs. net per pallet

Table 16

Banana Rooms – Refrigeration Requirements

 

Number

Evaporator

Approx.

Elect.

Room

Boxes

BTU Per

CFM Air

Heat

Size

Prod.

10º TD

Volume

Input

1/2 Car

432

36000

6000

6Kw

1 Car

864

72000

12000

12Kw

2 Car

1728

144000

24000

24Kw

Table 17

 

 

 

 

Meat Cutting/Prep Room Load

(BTU/HR/SQ FT of floor area)

 

 

 

 

Floor

Approx. 65% R.H.

 

Room Temp.

 

 

SQ FT

 

 

55ºF.

 

50ºF.

Room Loads based on continuous

 

 

100

93

 

105

operation and includes allowance

200

88

 

99

for average number of personnel,

300

85

 

95

processing equipment, etc., with

400

81

 

90

glass panel in one wall and walls

500

78

 

87

and ceiling insulated with 3” of

600

75

 

85

styrene with box located in air

700

72

 

81

conditioned area. Evaporator

800

69

 

78

should be low outlet velocity type

900

67

 

75

to avoid drafts and should be

1000

65

 

73

selected for continuous operation

1200

62

 

69

and not less than 30ºF. evap. temp.

Table 18

Rapid load selection for back bars

(Based on 2” glass fiber or

equivalent insulation and 50ºF., T.D.)

 

 

 

Back Bar

 

BTU/Hour Load Based on

Length in feet

 

16 Hour Compressor Operation

6 Feet

 

1,060

8 Feet

 

1,416

10 Feet

 

1,770

12 Feet

 

2,120

15 Feet

 

2,650

20 Feet

 

3,540

Table 19

Refrigeration requirements for hardening ice cream

Overrun

Hardening Load, BTU

Percent

per Gal. Ice Cream

60

532

70

500

80

470

90

447

100

425

110

405

120

386

Percentage overrun =

100 x Wt. per gal. of mix - Wt. per gal. of ice cream Wt. per gal. of ice cream

Ice cream assumed at 25ºF., and 30% frozen, entering hardening room.

To retain a smooth texture in hardened ice cream, it is necessary to freeze the remaining water content rapidly. With forced air circulation, time to harden will be about 10 hours with room maintained at -20. Hardening rooms are usually sized to allow for minimum of 3 times the daily peak production and for a stock of all flavors with the size based on 10 gallons per sq. ft. stacked solid 6 ft. high, including space for isles.

Reprinted by permission from

ASHRAE 1974 APPLICATION HANDBOOK

Table 20

Glass Door Loads

Box

BTU per

Temperature

Door

+35

1060

+30

960

0

1730

-10

1730

-20

1730

*Adjusted for 16-18 hour run time. Multiply number of doors times door load above and add to box load.

19

Page 19
Image 19
Heatcraft Refrigeration Products H-ENGM0408, H-ENGM0806 manual Banana Ripening Room