Banana Ripening Room
Banana hands or cluster shipped greens in fiberboard cartons, 10” x 16” x 22”, holding 42 lb. net (47 lbs. gross weight) with
864 boxes (3,288) lbs, net in a carload lot. Temperature held 56 to 58ºF.
Ripening facility consists of 5 or more air tight rooms to permit a completely weekly
Heating is provided to bring the load up to temperature before ripening process is initiated. 12 to 20 Kw per carload. (Electric heater sheath temperature not over 600ºF. in dead still air).
Evaporators are selected at a T.D. of 15ºF., or less, with evaporator temperature controlled at no less than 40ºF. Approximately 12.5 cfm at 2/3” to 3/4” static per 41 lb. box of bananas.
Pull down load for 1ºF./hr. pull down rate based on maximum heat of respiration of 2.5 BTU/lb. and 0.8 sp. ht. for bananas and 0.4 for fiberboard boxing, plus minimal wall losses etc., 80 to 85 BTU/hr./ box of bananas. Holding load approximately 44 BTU/hr./box.
Extracted from ASHRAE 1974 APPLICATION HANDBOOK.
Loading: 5.3 lbs./Cu. Ft. of box, 11.28 lbs. net per pallet
Table 16
Banana Rooms – Refrigeration Requirements
| Number | Evaporator | Approx. | Elect. |
Room | Boxes | BTU Per | CFM Air | Heat |
Size | Prod. | 10º TD | Volume | Input |
1/2 Car | 432 | 36000 | 6000 | 6Kw |
1 Car | 864 | 72000 | 12000 | 12Kw |
2 Car | 1728 | 144000 | 24000 | 24Kw |
Table 17 |
|
|
|
|
Meat Cutting/Prep Room Load | (BTU/HR/SQ FT of floor area) | |||
|
|
|
| |
Floor | Approx. 65% R.H. |
| ||
Room Temp. |
|
| ||
SQ FT |
|
| ||
55ºF. |
| 50ºF. | Room Loads based on continuous | |
|
| |||
100 | 93 |
| 105 | operation and includes allowance |
200 | 88 |
| 99 | for average number of personnel, |
300 | 85 |
| 95 | processing equipment, etc., with |
400 | 81 |
| 90 | glass panel in one wall and walls |
500 | 78 |
| 87 | and ceiling insulated with 3” of |
600 | 75 |
| 85 | styrene with box located in air |
700 | 72 |
| 81 | conditioned area. Evaporator |
800 | 69 |
| 78 | should be low outlet velocity type |
900 | 67 |
| 75 | to avoid drafts and should be |
1000 | 65 |
| 73 | selected for continuous operation |
1200 | 62 |
| 69 | and not less than 30ºF. evap. temp. |
Table 18
Rapid load selection for back bars
(Based on 2” glass fiber or | equivalent insulation and 50ºF., T.D.) | |
|
|
|
Back Bar |
| BTU/Hour Load Based on |
Length in feet |
| 16 Hour Compressor Operation |
6 Feet |
| 1,060 |
8 Feet |
| 1,416 |
10 Feet |
| 1,770 |
12 Feet |
| 2,120 |
15 Feet |
| 2,650 |
20 Feet |
| 3,540 |
Table 19
Refrigeration requirements for hardening ice cream
Overrun | Hardening Load, BTU |
Percent | per Gal. Ice Cream |
60 | 532 |
70 | 500 |
80 | 470 |
90 | 447 |
100 | 425 |
110 | 405 |
120 | 386 |
Percentage overrun =
100 x Wt. per gal. of mix - Wt. per gal. of ice cream Wt. per gal. of ice cream
Ice cream assumed at 25ºF., and 30% frozen, entering hardening room.
To retain a smooth texture in hardened ice cream, it is necessary to freeze the remaining water content rapidly. With forced air circulation, time to harden will be about 10 hours with room maintained at
Reprinted by permission from
ASHRAE 1974 APPLICATION HANDBOOK
Table 20
Glass Door Loads
Box | BTU per |
Temperature | Door |
+35 | 1060 |
+30 | 960 |
0 | 1730 |
1730 | |
1730 |
*Adjusted for
19