General Guidelines
Application | T.D. | Coil | Notes |
|
|
|
|
Convenience Store | 10 - 15ºF. | Low Silhouette | Multiple units for adequate air coverage |
|
|
| Up to 18’ long = 1 coil |
|
|
| Up to 30’ long = 2 coils |
|
|
| Up to 40’ long = 3 coils |
|
|
| Estimating guide: Cooler 100 SF/ton* |
|
|
| Freezer 75 SF/ton* |
|
|
|
|
Holding Warehouse | 10 - 15ºF. | Medium or | Forklift Operation |
|
| Heavy Duty | Average air changes |
|
|
| Product load 10 - 15% of total load |
|
|
| Estimating guide: 200 - 300 SF/ton |
|
|
|
|
Produce Warehouse | 7 | Low Velocity | High seasonal loads |
|
| Medium | Heavy product respiration |
|
| or Heavy Duty | Additional humidity may be required |
|
|
| Estimating guide: 150 - 200 SF/ton |
|
|
|
|
Blast Cooler or Freezer | 7 - 10ºF. | Heavy Duty | High air velocity, heavy infiltration |
|
|
| Fast defrost |
|
|
| Product spaced to allow air circulation |
|
|
| Equipment sized to extract all interior heat |
|
|
| Box temp below desired product temperature |
|
|
| Multiple units to provide capacity control |
|
|
| 1.5 safety factor sometimes applied to handle |
|
|
| initial high rate of product heat evolution |
|
|
|
|
Ice Cream Hardening | 10ºF. | Heavy Duty | 10 hour pull down with product 30% frozen and a |
|
|
| certain percentage over run |
|
|
| (thickness of ice cream) |
|
|
|
|
Controlled Temperature | 15 - 20ºF. | Heavy Duty | Floating box temperature |
Beer Warehouse |
|
| average monthly dew point |
|
|
| Auxiliary air circulation may be required due to |
|
|
| high T.D. |
|
|
| Heavy loading - high infiltration |
|
|
| 20 - 30ºF. pull down on beer |
|
|
|
|
Candy Warehouse | 20 - 25ºF. | Heavy Duty | Low relative humidity |
|
|
| Auxiliary air circulation and reheat may be required |
|
|
| Vapor barrier essential |
|
|
|
|
Prep Room | 20ºF. | Low Velocity | Heavy motor and personnel load |
|
|
| Estimating guide: 150 SF/ton |
|
|
|
|
Floral Box | 8ºF. | Low Velocity | Light loading conditions |
|
|
| Glass Walls |
|
|
| Estimating guide 100 SF/ton* |
|
|
|
|
SF = Floor Square Foot ton = 12,000 BTUH |
|
|
Note: Estimating guide ball park figures only. All attempts should be made to obtain accurate job survey and subsequent refrigeration calculations.
* Glass doors assumed on one long wall only
23