Heatcraft Refrigeration Products H-ENGM0408, H-ENGM0806 manual General Guidelines

Models: H-ENGM0408 H-ENGM0806

1 44
Download 44 pages 62.93 Kb
Page 23
Image 23

General Guidelines

Application

T.D.

Coil

Notes

 

 

 

 

Convenience Store

10 - 15ºF.

Low Silhouette

Multiple units for adequate air coverage

 

 

 

Up to 18’ long = 1 coil

 

 

 

Up to 30’ long = 2 coils

 

 

 

Up to 40’ long = 3 coils

 

 

 

Estimating guide: Cooler 100 SF/ton*

 

 

 

Freezer 75 SF/ton*

 

 

 

 

Holding Warehouse

10 - 15ºF.

Medium or

Forklift Operation

 

 

Heavy Duty

Average air changes

 

 

 

Product load 10 - 15% of total load

 

 

 

Estimating guide: 200 - 300 SF/ton

 

 

 

 

Produce Warehouse

7 -10ºF.

Low Velocity

High seasonal loads

 

 

Medium

Heavy product respiration

 

 

or Heavy Duty

Additional humidity may be required

 

 

 

Estimating guide: 150 - 200 SF/ton

 

 

 

 

Blast Cooler or Freezer

7 - 10ºF.

Heavy Duty

High air velocity, heavy infiltration

 

 

 

Fast defrost (4-6 FPI coils)

 

 

 

Product spaced to allow air circulation

 

 

 

Equipment sized to extract all interior heat

 

 

 

Box temp below desired product temperature

 

 

 

Multiple units to provide capacity control

 

 

 

1.5 safety factor sometimes applied to handle

 

 

 

initial high rate of product heat evolution

 

 

 

 

Ice Cream Hardening

10ºF.

Heavy Duty

10 hour pull down with product 30% frozen and a

 

 

 

certain percentage over run

 

 

 

(thickness of ice cream)

 

 

 

 

Controlled Temperature

15 - 20ºF.

Heavy Duty

Floating box temperature (40-72ºF.) contingent on

Beer Warehouse

 

 

average monthly dew point

 

 

 

Auxiliary air circulation may be required due to

 

 

 

high T.D.

 

 

 

Heavy loading - high infiltration

 

 

 

20 - 30ºF. pull down on beer

 

 

 

 

Candy Warehouse

20 - 25ºF.

Heavy Duty

Low relative humidity

 

 

 

Auxiliary air circulation and reheat may be required

 

 

 

Vapor barrier essential

 

 

 

 

Prep Room

20ºF.

Low Velocity

Heavy motor and personnel load

 

 

 

Estimating guide: 150 SF/ton

 

 

 

 

Floral Box

8ºF.

Low Velocity

Light loading conditions

 

 

 

Glass Walls

 

 

 

Estimating guide 100 SF/ton*

 

 

 

 

SF = Floor Square Foot ton = 12,000 BTUH

 

 

Note: Estimating guide ball park figures only. All attempts should be made to obtain accurate job survey and subsequent refrigeration calculations.

* Glass doors assumed on one long wall only

23

Page 23
Image 23
Heatcraft Refrigeration Products H-ENGM0408, H-ENGM0806 manual General Guidelines