.A complete Parts List is available at www.HobartWelders.com
5-5. Sequence Of Cutting Operation
Connect work clamp to a clean, |
location on workpiece, as close to cutting |
area as possible. |
90° |
For standard (shielded) cutting, place drag |
shield on edge of metal. For extended |
standoff distance (dragging tip will reduce tip |
life). |
Adjust torch speed so |
sparks go thru metal and |
out bottom of cut. |
.Set air pressure to 75 PSI (517 kPa) for cutting.
The pilot arc starts immediately when trigger is pressed.
Raise trigger lock and press | After cutting arc starts, slowly |
trigger. Pilot arc starts. | start moving torch across metal. |
Pause briefly at end of | Postflow continues for approx. 20 seconds |
cut before releasing trigger. | after releasing trigger; cutting arc can be |
| instantly restarted during postflow by raising |
| trigger lock and pressing trigger. |
| 801 |