INSTALLING MOWER
Lift Arms Fasten to Mower Deck
LOADER
0.2in SUB FRAME
MOWER DECK STOP
1
Fastening Lift Arms to Mower Deck
1..Screw the eye bolt into the lift eye and adjust to 137 mm (5.4 in) length.
2.Attach the eye bolt to the mower brackets with a , clevis pin and secure it with a linchpin.
3.Pull down lift arm and align the oval hole of the lift joint in the clevis of the lift arm, insert a clevis pin and secure it with a linchpin.
4.Raise the mower slowly with the hydraulic position control to check for full travel with no interference.
5.Adjust lift joints so gauge wheels lift off the ground at the same time.
Checking Mower Lift With Loader
1 - |
| If you have a front loader sub |
|
| frame installed, you must use the following |
| |
procedure to adjust the mower linkage to |
| ||
avoid damage to the deck or linkage. | \ |
i/
1.Slowly move the Lift Selector Lever to the "UP" position to raise the deck. Immediately lower the deck at the first indication of resistance.
2.Check the clearance between the deck stops and the front loader sub frame. Adjust the clearance to 5 mm (0.20 in) by adjusting the left lift rod length (shorteningthe lift rod raises the deck).
The fully raised position of the deck will be lower than normal with the loader sub frame installed. You will only be able to raise the deck to a maxi- mum cutting height of 4 in.