Hoshizaki C-100BAF-ADDS service manual Removal and Replacement of Extruding Head

Models: C-100BAF-AD C-100BAF-ADDS

1 44
Download 44 pages 37.83 Kb
Page 32
Image 32
2.Removal and Replacement of Extruding Head

2.Removal and Replacement of Extruding Head

1)Move the power switch to the "OFF" position, then unplug the unit from the electrical outlet.

2)Close the water supply line shut-off valve.

3)Remove all ice from the storage bin.

4)While maintaining a hold on the door, remove the hinge stop pin from hinge (B). Pull out the bottom of the door slightly, then gently remove the door from hinge (A). See Fig. 7.

5)Remove the top panel.

6)Remove the spout.

7)Remove the upper rear panel. See Fig. 9.

8)Remove the clamp securing the drain plug, then lower the drain hose into a container. Remove the drain plug to drain the water from the reservoir and evaporator assembly.

9)After all of the water has drained, replace the drain hose, drain plug, and drain clamp in their original positions.

10)Remove the cutter and packing.

11)Remove the allen head cap screws securing the extruding head and evaporator flange, then lift off.

Evaporator 3.Removal and Replacement of AugerManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background Flange Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Reservoir Hose

Spout

Packing

Cutter

Extruding

Head

Evaporator

Condensate Drain Pan

Drain Plug

Fig. 9

Clamp

Drain Hose

 

Upper Rear Panel

12)Place the evaporator flange and new extruding head in place, then tighten down the allen head cap screws.

13)Open the water supply line shut-off valve and check for water leaks. Replace the removed parts in the reverse order of which they were removed.

14)Plug the unit back in. Move the power switch to the "ON" position.

3.Removal and Replacement of Auger

1)Move the power switch to the "OFF" position, then unplug the unit from the electrical outlet.

2)Close the water supply line shut-off valve.

3)Remove all ice from the storage bin.

4)While maintaining a hold on the door, remove the hinge stop pin from hinge (B). Pull out the bottom of the door slightly, then gently remove the door from hinge (A). See Fig. 7.

5)Remove the top panel.

6)Remove the spout.

7)Remove the upper rear panel. See Fig. 9.

32

Page 32
Image 32
Hoshizaki C-100BAF-ADDS service manual Removal and Replacement of Extruding Head, Removal and Replacement of Auger