Hoshizaki C-100BAF-AD B. Sequence of Operation, Freeze Cycle, Bin Control Thermostat Shutdown

Models: C-100BAF-AD C-100BAF-ADDS

1 44
Download 44 pages 37.83 Kb
Page 9
Image 9
B. Sequence of Operation

B. Sequence of Operation

This icemaker utilizes a thermostatic bin control to switch the gear motor, fan motor, and compressor on and off as needed. This icemaker utilizes a float-operated water valve in the water reservoir to allow water into the icemaker as needed. After the power switch is placed in the "ON" position, the sequence is as follows:

1. Freeze Cycle

GM, FM, CR, and Comp energize. As the water in the evaporator cools, ice starts forming within 4 to 6 minutes. This time frame depends on the inlet water and ambient temperature conditions.

The float-operated water valve allows water into the reservoir as needed to continue the ice making process. This continues until BC shuts down the icemaker or power is turned off to the icemaker.

2. Bin Control Thermostat Shutdown

Ice fills storage bin to level of BC. When BC opens, GM, FM, CR, and Comp de‑energize. When ice level lowers and BC closes, the icemaker starts operating again.

C-100BAF Series Sequence Flow Chart and Component Operation

Power Switch "ON" 1. Freeze Cycle

BC closed2. Bin Control Thermostat Shutdown

1. Freeze Cycle

 

 

 

 

 

 

2. Shutdown

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Full Bin

The float-operated water valve allows

 

 

 

When BC opens, the icemaker shuts

water into the reservoir as needed to

 

 

 

down. When BC closes, the icemaker

continue the ice making process.

 

 

 

starts operating again.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BC open

 

 

 

 

 

 

 

 

 

 

 

BC closed

BC closed

BC open

GM energized

GM continues

GM de-energized

FM energized

FM continues

FM de-energized

CR energized

CR continues

CR de-energized

Comp energized

Comp continues

Comp de-energized

Legend: BC–bin control thermostat; Comp–compressor; CR–compressor relay; FM–fan motor; GM–gear motor

9

Page 9
Image 9
Hoshizaki C-100BAF-ADDS service manual B. Sequence of Operation, Freeze Cycle, Bin Control Thermostat Shutdown