Hoshizaki C-100BAF-ADDS service manual 9Plug the icemaker into the electrical outlet

Models: C-100BAF-AD C-100BAF-ADDS

1 44
Download 44 pages 37.83 Kb
Page 25
Image 25

7)Make sure all hose connections are secure, then reinstall the lower rear panel and upper rear panel in their correct positions. WARNING! Make sure that there are no wires pinched between the rear covers and icemaker.

8)Resecure the vent hose to the icemaker. CAUTION! The vent hose must be attached and secured to the icemaker or water damage may occur. Make certain there are no kinks in the vent hose. The drain pump will not operate correctly with a partially blocked vent hose.

9)Plug the icemaker into the electrical outlet.

10)Test the drain pump by slowly pouring water into the icemaker's ice storage bin. Approximately 1 pint (500 ml) of water is required to close the lower float switch and activate the drain pump. The drain pump will turn on automatically and pump out the water.

11)To test the operation of the drain pump internal safety switch, move the power switch to the "ON" position. Pour another quart (950 ml) of water into the icemaker's ice storage bin, then completely restrict the discharge hose while the drain pump is operating.

Pour more water into the icemaker's ice storage bin until the upper float switch closes and the icemaker turns off. The drain pump will continue to operate. Check for leaks. Remove the discharge hose restriction and allow the water to be pumped out normally. Power to the icemaker will be restored when the water in the drain pump returns to a normal level and the upper float switch opens.

25

Page 25
Image 25
Hoshizaki C-100BAF-ADDS service manual 9Plug the icemaker into the electrical outlet