Hoshizaki DCM 300BAH(-OS) Removal and Replacement of Auger, Removal and Replacement of Evaporator

Models: DCM 300BAH(-OS)

1 55
Download 55 pages 53.01 Kb
Page 43
Image 43
3.Removal and Replacement of Auger

9)Move the power switch to the "ON" position, then replace the panels in their correct positions.

10)Turn on the power supply, then move the control switch to the "ICE" position to start the automatic icemaking process.

3.Removal and Replacement of Auger

1)Move the control switch to the "DRAIN" position and drain all of the water from the evaporator.

2)After the water has stopped draining, move the control switch to the "OFF" position, then turn off the power supply. Remove the front and top panels, then move the power switch to the "OFF" position.

3)Remove the front cover of the storage bin. Remove spout B, then remove spout A. See Fig. 2.

4)Remove the apron panel, then remove the left side panel.

5)Remove the allen head cap screws securing the extruding head. Using the cutter, lift out the auger assembly.

6)Remove the cutter, extruding head, and upper part of the mechanical seal from the auger and place them on the new auger. NOTICE! To help prevent water leaks, be careful not to damage the surfaces of the O‑ring or mechanical seal.

7)Install the new auger assembly with the upper part of the mechanical seal attached and tighten down the allen head cap screws.

8)Replace spout A, spout B, and the front cover of the storage bin in their correct positions.

9)Move the power switch to the "ON" position, then replace the panels in their correct positions.

10)Turn on the power supply, then move the control switch to the "ICE" position to start the automatic icemaking process.

4.Removal and Replacement of Evaporator

NOTICE

Always install a new drier every time the sealed refrigeration system is opened.

Do not replace the drier until after all other repair or replacement has been made.

Install the new drier with the arrow on the drier in the direction of the refrigerant flow.

When brazing, protect the drier by using a wet cloth to prevent the drier from overheating. Do not allow the drier to exceed 250°F (121°C).

1)Move the control switch to the "DRAIN" position and drain all of the water from the evaporator.

2)After the water has stopped draining, move the control switch to the "OFF" position, then turn off the power supply. Remove the front and top panels, then move the power switch to the "OFF" position.

43

Page 43
Image 43
Hoshizaki DCM 300BAH(-OS) service manual Removal and Replacement of Auger, Removal and Replacement of Evaporator