Hoshizaki KM-1300SAH3, KM-1300SWH3, KM-1300SRH 2nd Cycle and after with no pump drain

Models: KM-1300SRH3 KM-1300SWH KM-1300SRH KM-1300SAH KM-1300SWH3 KM-1300SAH3

1 69
Download 69 pages 21.22 Kb
Page 22
Image 22
2nd Cycle and after with no pump drain

2nd Cycle and after with no pump drain

IMPORTANT

Freeze cycle time is limited by the freeze timer factory setting even if the Float Switch does not open.

1.Float Switch opens and signals to complete freeze cycle.

2.Thermistor reads 48° F. Defrost Timer starts counting.

IMPORTANT Water Valve opening is limited to 6 minutes.

4.After the first 5 minutes in freeze cycle. Ready to complete freeze cycle when Float Switch circuit opens.

IMPORTANT

Board never accepts freeze completion signal within the first 5 minutes in freeze cycle.

3.Defrost Timer stops counting.

Defrost cycle is completed and freeze cycle starts.

IMPORTANT

1.Board never accepts defrost completion signal within the first 2 minutes in defrost cycle.

2.Defrost cycle time is limited to 20 minutes even if Defrost Timer does not stop counting.

22

Page 22
Image 22
Hoshizaki KM-1300SAH3, KM-1300SWH3, KM-1300SRH3 service manual 2nd Cycle and after with no pump drain