Hoshizaki KML-200MAE, KML-200MWE service manual cSEQUENCE 1st Cycle

Models: KML-200MWE KML-200MAE

1 51
Download 51 pages 29.81 Kb
Page 12
Image 12
[c]SEQUENCE 1st Cycle

[c]SEQUENCE 1st Cycle

1.Unit energized and Control Switch to “ICE” position. Water supply cycle starts.

2.After 1 minute, Defrost cycle starts.

3.Thermistor reads 48° F. Defrost Timer (adjustable from 1 to 3 minutes) starts counting.

IMPORTANT Water Valve opening is limited to 6 minutes.

5.After the first 5 minutes in freeze cycle. Ready to complete freeze cycle when Float Switch circuit opens.

IMPORTANT

Board never accepts freeze completion signal within the first 5 minutes in freeze cycle.

4.Defrost Timer stops counting.

Defrost cycle is completed and freeze cycle starts.

IMPORTANT

1.Board never accepts defrost completion signal within the first 2 minutes in defrost cycle.

2.Defrost cycle time is limited to 20 minutes even if Defrost Timer does not stop counting.

12

Page 12
Image 12
Hoshizaki KML-200MAE, KML-200MWE service manual cSEQUENCE 1st Cycle