Hoshizaki KML-200MAE, KML-200MWE service manual 1Turn off the power supply

Models: KML-200MWE KML-200MAE

1 51
Download 51 pages 29.81 Kb
Page 40
Image 40
Manual background

8.REMOVAL AND REPLACEMENT OF WATER REGULATING VALVE - WATER-COOLED MODEL ONLY

IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

1)Turn off the power supply.

2)Close the Water Supply Line Shut-off Valve.

3)Remove the panels.

4)Recover the refrigerant and store it in an approved container.

5)Disconnect the Capillary Tube at the Condenser outlet using brazing equipment.

6)Disconnect the Flare-connections of the valve.

7)Remove the screws and the valve from the Rear Panel.

8)Install the new valve, and braze the Capillary Tube.

9)Install the new Drier.

10)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

11)Evacuate the system, and charge it with refrigerant. See the Nameplate for the required refrigerant charge.

12)Connect the Flare-connections.

13)Open the Water Supply Line Shut-off Valve.

14)Check for water leaks.

15)Replace the panels in their correct positions.

16)Turn on the power supply.

40

Page 40
Image 40
Hoshizaki KML-200MAE, KML-200MWE service manual 1Turn off the power supply