Manuals
/
Hoshizaki
/
Kitchen Appliance
/
Ice Maker
Hoshizaki
KML-200MAE service manual b KML-200MWE
Models:
KML-200MWE
KML-200MAE
1
8
51
51
Download
51 pages
29.81 Kb
5
6
7
8
9
10
11
12
<
>
Specifications
Install
Wiring Diagrams
V. Removal And Replacement Of Components
Maintenance
Problem
2Defrost Timer
Setting
Cleaning
a REFRIGERANT RECOVERY
Page 8
Image 8
[b]
KML-200MWE
8
Page 7
Page 9
Page 8
Image 8
Page 7
Page 9
Contents
MODEL
KML-200MAE KML-200MWE
HOSHIZAKI MODULAR CRESCENT CUBER
FOREWORD
CONTENTS
V. REMOVAL AND REPLACEMENT OF COMPONENTS
SERVICE FOR REFRIGERANT LINES
a REFRIGERANT RECOVERY
REMOVAL AND REPLACEMENT OF COMPRESSOR
I. SPECIFICATIONS 1. KML-200MAE
2. KML-200MWE
aKML-200MAE
II. GENERAL INFORMATION
1.CONSTRUCTION
b KML-200MWE
b CONTROLLER BOARD
2. CONTROLLER BOARD
a SOLID-STATECONTROL
2Defrost Timer
3High Temperature Safety - 127 ± 7F
4Low Water Safety
5High Voltage Cut-out
Alpine “C”/Alpine Board
cSEQUENCE 1st Cycle
LINE VALVE
2nd Cycle and after with pump drain
2nd Cycle and after with no pump drain
DIP SWITCH NO
Temperature F
iDisconnect the connector K3 on the board
2 Defrost Timer
SETTING
3 Drain Timer
SETTING
Dip Switch
Dip Switch
e CHECKING CONTROLLER BOARD
TEST PROGRAM OF CONTROLLER BOARD
b SERVICE SWITCH
3. SWITCHES
a CONTROL SWITCH
aKML-200MAE
III.TECHNICAL INFORMATION
1.WATER CIRCUIT AND REFRIGERANT CIRCUIT
b KML-200MWE
2.WIRING DIAGRAMS
aKML-200MAE, KML-200MWE
From Defrost Cycle To Defrost Cycle
3. TIMING CHART
If Float Sw. is OFF
To Freeze Cycle From Freeze Cycle
4.PERFORMANCE DATA aKML-200MAE
b KML-200MWE
APPROXIMATE ICE PRODUCTION PER 24 HR
IV. SERVICE DIAGNOSIS 1. NO ICE PRODUCTION
PROBLEM
POSSIBLE CAUSE
REMEDY
REMEDY
PROBLEM
POSSIBLE CAUSE
REMEDY
PROBLEM
POSSIBLE CAUSE
2. EVAPORATOR IS FROZEN UP
3. LOW ICE PRODUCTION
4. ABNORMAL ICE
5. OTHERS
V. REMOVAL AND REPLACEMENT OF COMPONENTS
1. SERVICE FOR REFRIGERANT LINES
a REFRIGERANT RECOVERY
bEVACUATION AND RECHARGE
3.REMOVAL AND REPLACEMENT OF COMPRESSOR IMPORTANT
2. BRAZING
17Replace the panels in their correct positions
13Install the new Drier
18Turn on the power supply
4. REMOVAL AND REPLACEMENT OF DRIER
5.REMOVAL AND REPLACEMENT OF EXPANSION VALVE
7Install the new Drier
1Turn off the power supply 2Remove the panels
6Install the new valve
7Install the new Drier
14Turn on the power supply
7.REMOVAL AND REPLACEMENT OF EVAPORATOR IMPORTANT
1Turn off the power supply
Page
10.REMOVAL AND REPLACEMENT OF THERMISTOR CAUTION
11. REMOVAL AND REPLACEMENT OF FAN MOTOR
12. REMOVAL AND REPLACEMENT OF WATER VALVE
13. REMOVAL AND REPLACEMENT OF PUMP MOTOR
14. REMOVAL AND REPLACEMENT OF SPRAY TUBE
1Turn off the power supply
7Turn on the power supply
2Remove the Front Panel and the Insulation Panel
1Turn off the power supply
7Move the Control Switch to the “ICE” position
8Replace Front Panel and turn on the power supply
1Turn off the power supply
5Turn off the power supply
2. CLEANING
13Turn off the power supply after 30 minutes
15Move the Service Switch to the “DRAIN” position
18Move the Control Switch to the “ICE” position
21Turn off the power supply after 3 minutes
1.0fl. oz. to 2 gal. of water
4. MAINTENANCE