W A R N I N G
E q u i p m e n t C a b i n e t
N o t e
Installing the Series 8200zl Switch
Installation Procedures
Installation Location
Before installing the switch, plan its location and orientation relative to other devices and equipment:
■In the front of the switch, allow at least 7.6 cm (3 inches) of space for the
■In the back of the switch, allow at least 10.2 cm (4 inches) of space for the power cord and cooling.
■On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.
2. Mount the Switch
The Series 8200zl Switch is a large heavy chassis, therefore ProCurve Networking recommends mounting the switch before populating it with modules or power supplies.
A base system weighs approximately 50 pounds, and an unloaded chassis weighs approximately 44 pounds. To avoid personal injury, plan on having at least two people available to help move the unit into place onto the rack. TWO OR MORE PEOPLE ARE REQUIRED WHEN MOUNTING THIS SWITCH.
The Series 8200zl Switch can be mounted in these ways:
■in a rack or cabinet
■on a horizontal surface
Rack or Cabinet Mounting
The Series 8200zl Switch is designed to be mounted in any
If you are installing the switch in an equipment cabinet, in place of the
Switch | Series the Installing |
| 8200zl |
|
|