Installing the Series 8200zl Switch

Installation Procedures

5. Verify the Switch Passes Self Test

After you have installed any modules and the optional second power supply, but before mounting the switch in its network location, you should first verify it is working properly by plugging it into a power source and verifying it passes its self test.

If you have installed a second power supply, repeat these procedures with the second power supply to verify it works correctly also.

1.Connect the power cord supplied with the switch to the power connector on the back of the switch, and then into a properly grounded electrical outlet.

the Series 8200zl

Switch

Installing

 

 

 

Connect power cord to

 

 

 

power connector

 

 

Figure 2-9. Power Connector on Back of Switch

 

 

 

 

N o t e

The Series 8200zl Switch does not have a power switch. It is powered on when

 

the power cord is connected to the switch and to a power source.

 

If your installation requires a different power cord than the one supplied with

 

the switch, please see the “Installation Precautions” on page 2-6.

 

2. Check the LEDs on the switch and on each of the switch modules. The

 

 

LED behavior is described on the next page.

 

If the LED display is different than what is described, especially if the

 

Fault LED stays on for more than approximately 120 seconds or it starts

 

blinking, the self test has not completed correctly. Refer to chapter 5,

 

“Troubleshooting” for diagnostic help.