Installing the Fibre Channel to SCSI Router for the

Installation

NonStop NS-Series Server

 

11.Power on the tape drive. For the power switch location, see Figure 3-4 on page 3-4.Then wait for it to perform its power-on-self-test (POST).

12.Power on the router, and then wait for it to perform its power-on-self-test (POST).

M8201R Fibre Channel to SCSI Router Installation and User’s Guide529971-005

3-7