a.Using a T-25 Torx driver, insert and tighten the two flathead T-25 Torx screws into the condensation pump.

b.Using a T-25 Torx driver, insert and tighten the four T-25 Torx screws into each corner of the water group cover.

9.Replace the bottom fan unit ("Replacing the bottom fan unit" on page 29).

10.Replace the water controller ("Replacing the water controller" on page 59).

11.Reconnect the main outlet water hose ("Reconnecting the main water hoses" on page 73).

12.Reconnect the power cables ("Reconnecting the power" on page 73).

13.Restore the water flow to the MCS G2 unit ("Restoring water flow" on page 74).

14.Complete the operation checklist (on page 73).

Removal and replacement procedures 43