a.Using a T-25 Torx driver, remove the two flathead T-25 Torx screws that secure the condensation pump.

b.Using a T-25 Torx driver, remove the four T-25 Torx screws at each corner that secure the water group cover to the MCS G2 unit.

7.Remove the condensation pump ("Removing the condensation pump" on page 30).

8.Remove the sheet metal bulkhead.

Removal and replacement procedures 66