9.Close the processor socket retaining bracket and the processor retaining latch.

10.Install the heatsink. See the server installation sheet.

11.Install the access panel.

Installing a processor in HP ProLiant ML110 (G2, G3, and G4) and ProLiant ML150 Generation 2 Servers

CAUTION: To prevent possible server malfunction and damage to the equipment, do not mix single- and dual-core processors or processors with different speeds or cache sizes.

1.Power down the server (on page 6).

2.Extend the server from the rack, if applicable.

3.Remove the access panel ("Access panel" on page 11).

4.Open the processor retaining bracket.

5.Release the processor locking lever.

CAUTION: Failure to completely open the processor locking lever prevents the processor from seating during installation, leading to hardware damage.

6.Install the processor and close the processor retaining bracket. Refer to the installation sheet for server-specific installation instructions.

CAUTION: To prevent possible server malfunction or damage to the equipment, be sure to completely close the processor locking lever.

Hardware options installation 15