Installation and Setup
1.Align the end of the ceiling-mount bracket 1 with the center hole in the lower-mount bracket 2, and firmly secure it with a washer 3 and bolt 4.
2.Align the three holes on the projector with the lower-mount bracket and firmly secure with three screws.
Reference Guide
19