Husqvarna ZTH5223 manual Adjusting the Throttle Wire, Dismantling and Assembling, Troubleshooting

Models: ZTH5223 ZTH6125

1 73
Download 73 pages 53.2 Kb
Page 33
Image 33
Dismantling and Assembling

REPAIRS

inlet.

14.Connect and adjust the gas and choke wires (see below).

15.Check that the oil drain valve is closed and fill the engine with oil (see Delivery Servicing\Delivery Service).

16.Connect the positive cable (red) to the battery’s positive terminal.

17.Open the fuel valve.

Dismantling and Assembling

Adjustments and Specific Repairs

See the Kawasaki Service Manual for the engine and auxiliary systems.

Troubleshooting

See section 8 of the Kawasaki Service

Manual.

The above section contains a troubleshooting guide for the engine and auxiliary systems. It also has separate troubleshooting instructions for the starter motor.

Adjusting the Throttle Wire

Adjusting Throttle Lever Tension

If there is insufficient throttle lever friction, throttle settings can alter while the mower is being operated. This can be corrected via the lever’s pivot bolt.

1.Free the control console and pull forwards.

2.Tighten the throttle lever’s pivot bolt.

8011-599

Checking and Adjusting the Throttle Wire

Check that the engine responds to the throttle control and that the correct engine speed is achieved at full throttle.

If adjustment is necessary, adjust the lower wire as follows:

1.Loosen the clamping screw holding the wire’s outer casing and set the lever to the full throttle position.

2.Check that the throttle wire is attached to the correct hole in the lower lever, see

Freeing the controle console

8011-554

Checking and adjusting the throttle wire

English-31

Page 33
Image 33
Husqvarna ZTH5223, ZTH6125 manual Adjusting the Throttle Wire, Dismantling and Assembling, Adjustments and Specific Repairs