Main
            Page
            Page
            Page
              Contents
              iv 
            Page
            Page
              About this manual
Important safety information                
Online support
            Page
              General Checkout
              Power checkout
2              
Powering off the rack
            Page
              Type 9306 Model 250/420/421
Note: The illustrations in this documentation might be slightly different from your hardware.              
Installing a rack cabinet
1.One U is equal to 4.45 cm (1.75 in.)                
6
The NetBAY25 Rack cabinet is a 25U-high rack cabinet                
IBM NetBAY Rack Planning Guide
            Page
            Page
            Page
              Installing stabilizer brackets
10             
Page
              Removing and installing NetBAY25 panels
12               
Removing and installing NetBAY42 panels
              14 
            Page
              Door latches
16               
Removing and installing rack doors
              18 
            Page
            Page
            Page
              Attaching NetBAY42 Rack cabinets in a suite
22               
Managing cables
              Cable-management brackets
24               
Moving a rack cabinet
              26 
            Page
              Part Listing (Type 9306)
28             
Page
            Page
              Type 9306 Models 200/900/910
              Parts Listing (Type 9306 Model 200)
32             
Page
              Type 9306 Model 900/910
Side Panel                
34 
              Perforated Doors (model 910)
Installing the new door on a model 900 rack cabinet              
36 
            Page
              Parts listing (Type 9306 Model 900/910)
38             
Page
              40 
              Type 9306 Models 4QS, 4QX, 9QS, 9QX, 9TS, 9TX
IBM PC Server expansion rack models                
Server selector console
              Server selector unit
42               
Connections
Power distribution unit                
Type9306 Models 4QS, 4QX, 9QS, 9QX, 9TS, 9TX 43
              Cooling fan
44               
Sliding trays
Single latch rail tray                
Dual latch rail tray
              Sliding rails
46               
Keyboard tray
              Parts listing (Type 9306  19-inch) Models 9QS, 9TS and 9QX, 9TX
This parts listing is for Models 9QS, 9TS and 9QX, 9TX                
48 
            Page
              50 
              Parts listing (Type 9306  24-inch) Models 4QS, 4QX
This parts listing is for Models 4QS and 4QX.                
Type9306 Models 4QS, 4QX, 9QS, 9QX, 9TS, 9TX 51
              52 
            Page
            Page
            Page
            Page
            Page
            Page
            Page
              Removing and installing the top 6U side panels
60               
Doors
              Front and rear doors  Models 42P,42X, 4SA, 4SB
62               
Rear door  Models 42S, 42E
Front door  Models 42S, 42E            
Page
              Removing and installing the top 6U portion of the rack
              Installing the stabilizer bracket
Attaching rack cabinets in a suite                
66 
            Page
              Installing L-channel support rails to rack mounting brackets
68             
Page
              70 
              Parts listing (Type 9308 Model 42P, 42X)
              72 
              NetBAY3 enclosure
Casters            
Page
            Page
            Page
            Page
              Parts Listing (NetBAY3)
78               
NetBAY3E enclosure
Casters            
Page
            Page
              82 
              Parts listing (NetBAY3E)
            Page
              1U Flat Panel Monitor Console Kit
              86 
              Installing the Flat Panel Monitor Console Kit
Installing the flat panel monitor and keyboard tray              
88 
            Page
              90 
            Page
              92 
            Page
              94 
              Installing an optional console switch
            Page
            Page
            Page
            Page
            Page
              Installing Optional Devices
              Installing devices on the rack cabinet mounting flanges
102             
Page
              Installing threaded rails or bars
Installing cage nuts                
104 
Using the cage-nut-insertion tool              
Using a flat-blade screwdriver
Clip Nuts              
Installing an uninterruptible power supply
106             
Page
              Installing a power distribution unit
108             
Page
              Installing a PDU vertically
110               
Installing a PDU horizontally
Installing a server              
Installing a large server
Installing a small server                
112 
            Page
              Installing a storage expansion unit
114               
Installing a Fibre Channel RAID controller unit
Installing a Fibre Channel hub              
Installing an SP switch
116               
Installing a fixed shelf
              118 
              Installing a keyboard tray
Installing a flat panel monitor rack mount kit              
Installing a monitor shelf
120               
IBM NetBAY Console Switch
              122 
            Page
              Specifications
124               
Installing a console switch vertically in a rack
            Page
            Page
              Installing a console switch horizontally in a rack
128             
Page
              Parts listing (NetBAY Console Switch)
NetBAY Power Distribution Units                
130 
NetBAY rack Power Distribution Unit introduction            
Page
              Installing devices vertically
132               
Installing a single device horizontally
              134 
              Installing two devices horizontally
              136 
              Cabling your PDUs
              Cabling instructions for vertical-mount PDUs
138             
Page
              Cabling instructions for horizontal-mount PDUs
140             
Page
            Page
              Rack PDU specifications
              Power cables
144                 
Line cords
              NetBAY front-end Power Distribution Unit introduction
              Installing a single device vertically
146             
Page
              148 
              Installing two devices vertically
              150 
            Page
            Page
            Page
              Rack PDU specifications
154               
Line cords
Power cables                
NetBAY server dual-cord Power Distribution Unit introduction
              Installing devices vertically
156             
Page
              Installing a single device horizontally
158             
Page
              Installing two devices horizontally
160             
Page
              Cabling your PDUs
162             
Page
              Cabling instructions for vertical-mount PDUs
164               
Cabling instructions for horizontal-mount PDUs
              166 
            Page
              Rack PDU specifications
168               
Power cables
              Line cords
170                 
Parts listing (Power Distribution Units)
Selector switch locations              
Figure73. Selector switch in monitor compartment
FRONT                
Installing Optional Devices 171
REAR                
Figure74. Selector switch between side panels
              Selector switch cable connections
Tiered switch configuration                
172 
Figure75. Selector switch rear of rack with blank panel front of rack              
Selector switch environment
Resetting the selector switch                
Installing Optional Devices 173
Figure76. Single selector switch                
Figure77. Multiple selector switch
            Page
            Page
              Installing the new monitor stand
176             
Page
              178 
            Page
              180 
              Starting the system
              Configuring the selector switch
Switching among servers                
182 
              Advanced selector switch functions
Scanning the servers                
Displaying version information and device settings
              Saving Hardware Configuration
Resetting the mouse and keyboard                
184 
Setting a scan pattern              
Assigning Unique Names to Servers
              Changing menu attributes
186               
Changing the status flag attributes
              Assigning specific device types
188             
Page
            Page
              Related service information
Safety information              
192 
            Page
              194 
            Page
              196 
            Page
              Safety notices (multilingual translations)
198             
Page
              200 
            Page
              202 
            Page
              204 
            Page
            Page
            Page
            Page
            Page
            Page
            Page
              212 
            Page
              214 
            Page
              216 
            Page
              218 
            Page
              220 
            Page
            Page
            Page
            Page
            Page
            Page
            Page
              228 
              Safety inspection guide
              Handling electrostatic discharge-sensitive devices
230               
Grounding requirements
Problem determination tips              
232