Chapter | 3. | Removing | and | Reinstalling the Quad T1/E1 DTA |
|
|
|
| |||
This | chapter | contains | information on removing | and | reinstalling | the | Quad T1/E1 | DTA | |||
from the base adapter. In this section, the IBM ARTIC960RxD PCI Adapter is | |||||||||||
referred | to | as | the | base adapter, and | the | Quad T1/E1 | DTA | is referred | to as | ||
mezzanine | card. |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| |
Removing | the | Quad | T1/E1 | DTA |
|
|
|
|
|
|
The following procedure describes how to remove the mezzanine card from the bas adapter. The procedure varies depending on your system unit. Refer to the documentation that came with your system unit for detailed instructions on performing the following procedures:
Ÿ | Shutting | down | your | system | unit |
Ÿ | Removing | the | system | unit | covers |
ŸRemoving an adapter from the system unit
Note: |
|
|
|
|
|
|
|
|
|
|
|
Ÿ Be sure to hold the IBM | ARTIC960RxD | Quad | DTA by the edges | only; | do | not | |||||
touch the | component | pins or | solder joints. |
|
|
|
|
|
| ||
Ÿ If | more | than one | adapter | is installed, remove | the H.100 | cable and note the | |||||
of | JP01. |
|
|
|
|
|
|
|
|
|
|
1. Remove the four mounting screws from the | base | adapter | as | shown | in | the | |||||
following figure. (The two | cards are | still | held | together | by | the | PMC | connector.) |
2. Carefully | separate | the | connector | on the | mezzanine card from the connector on |
the base | adapter | using | a gentle | rocking | motion. |
Chapter 3. Removing/Reinstalling the Quad T1/E13- DTA