Reinstalling

the

Quad T1/E1

DTA

 

 

The

following

instructions

assume

that

you have the base adapter out of the system

unit

and

are

ready to

install

the

mezzanine card.

Before You Begin

Verify that the jumper on the base adapter is set properly (see page 1-3).

1.Align the connector on the mezzanine card with the PMC connector on the base adapter.

Attention:

 

 

 

 

 

When

the base

adapter

and the mezzanine card are

properly aligned,

the top

of

the

voltage keying pin on

the base adapter fits into

the voltage key

opening

on

the

mezzanine

card.

 

 

 

 

2. Firmly press the mezzanine card and the base adapter connectors together.

3. Install the four mounting screws; then tighten the screws.

4. Follow the procedure “Jumper Installation Information” on page 1-3.