EonStor A16E-G2130-4 Installation and Hardware Reference Manual

power up the subsystem and configure the RAID array. (See Section 4.4)

2.4.1 Installation Procedure Flowchart

Figure 2-1shows a flowchart of the installation procedure. As you complete each step, check off the “Done” box on the right. Please use this flowchart in conjunction with the instructions that follow.

Figure 2-1: Installation Procedure Flowchart

2.5 Unpacking the Subsystem

Use the Unpacking Checklist in your package to verify package contents. Carefully check the items contained in each box before proceeding with installation.

NOTE:

A detailed packing list can be found in your product shipping package or product CD.

The space within each package carton can be separated into upper and lower levels.

Upper level: The two (2) foam packages on the upper level contain:

Sixteen (16) drive trays

2-6

Unpacking the Subsystem