SECTION 2—PARTS AND INSTALLATION

10.Check for leaks in supply or drain lines and check operation of tub. Refer to Operation on page 22.

NOTE: Check local codes regarding maximum water temperature allowed at hot water outlets for facility type.

Plumbing

HOT

In House

COLD

Water Service

Schematic

Optional

 

 

 

 

Pressure

 

 

 

 

Regulator

 

 

RADA Mixing Valve

 

 

 

 

 

 

 

 

Shower

Tub Spout

Tub Fill Valve

 

 

Control Valve

 

 

 

 

 

 

(Nearest

 

 

 

 

Tub)

 

 

Disinfectant Injector

Back Flow

 

 

Backflow

 

 

Preventor

Preventer

 

 

 

3-Way

 

 

 

 

 

 

Selector

Burp

 

 

 

Valve

 

 

 

Fitting

 

 

 

 

Flowmeter

Check

 

 

 

Check

 

 

Valve

 

 

Valve

 

 

 

Pump

 

 

 

ICCG

Disinfectant

Suction Return Line

FIGURE 2.7 Plumbing Installation

Post Installation Checklist

Before putting the tub into service, check the following:

Water lines have been purged of any foreign matter.

Both hot and cold water lines are properly connected to tub.

Dedicated 115V 15AMP AC power line is properly wired to unit.

Power line is protected by a 15AMP GFCI.

All water lines are checked for leaks.

ICCG skin care and cleaning products have been ordered. To place your order, call 800‐668‐2337.

ICCG representative has been called at 800‐668‐2337 to arrange for an In‐Service on tub.

Part No 1150695

21

Recessed Side Entry Bath Tubs

Page 21
Image 21
Invacare 3750, 3800 manual Post Installation Checklist, Plumbing Installation