Kathrein MSK 25 Commissioning, Switching-Up, Switching-Off, Software Accu −−−−− LEV 48.5dBuV

Models: MSK 25

1 56
Download 56 pages 2.5 Kb
Page 14
Image 14

Commissioning

Switching-Up

Software V2.0

SN: 000222

ACCU [−−−−−]

 

 

CH: .02.

TV

LEV: 48.5dBuV

A

 

 

 

 

Switching-Off

Connect the instrument to the mains with the wall power supply.

Turn the on/off switch to the right.

Adjust the desired volume.

The LC display will then indicate the particular software version for appr. 1 second.

Thereafter the LC display will indicate the loading capacity of the battery for appr. 3 seconds.

One segment comes up to appr. 20% of the overall capacity (3.4 Ah).

Now, feed in the reception signal of the receiving installation in the RF input socket.

LC display:

channel

mode

level (A = analogue level measurement; D = digital level measurement)

Select the desired mode by pressing [TV/SAT]

Turn the on/off switch counter-clockwise.

14

Page 14
Image 14
Kathrein MSK 25 manual Commissioning, Switching-Up, Switching-Off, Software Accu −−−−− LEV 48.5dBuV